PGSR was engaged to provide project / site management, supervision, trades and non-trades to execute the minor outage works on the Muja M8 units and major outage works on the M7 Units.
Specific works included;
- M7 Major Outage – HIP Turbine, Turbine Valves, Minor Generator Inspection
- M8 Minor Outage – Turbine Valves
PGSR Provide Labour and Tooling to perform 2 x Combined MSCV valve disassembly, inspection and re-assembly. Remedial works lapping / valve bush / stem honing and additional works.
PGSR provide Labour and Tooling to perform HP Main Stop Valve inspection and IP/Reheat Control Valve inspections
Minor Outage works inspection and maintenance of steam turbine.
PGSR provided Labour and Tooling to Install upgrade components in existing HP and IP Outer Cylinders, unpack and preparation minor works to facilitate upgrade.
PGSR provide Labour and Tooling to support Toshiba in De-commission and removal of existing (analog) AVR and Thyristor (THY) cabinets and Installation and commissioning of replacement (Digital) AVR and THY cubicles.
PGSR has been invited back to Jeeralang to engaged to provide all trades, non-trades and supervisory resources to execute the major outage works on the Jeeralang B3 gas turbine and Generator.
PGSR was engaged to provide project/site management, supervision, trades and non-trades to execute the minor outage works on the Muja M5 and M6 Units.
Specific works included;
- Pedestal Bearing Inspections
- Inspect and report on ESV valves
- M6 LP Blade Inspection
- M5 H2 Cooler Inspection
PGSR was engaged to provide all trades and non-trades resources to execute the major outage works on the Liddell Transformer Replacement & Service.