PGSR was engaged to provide all trades and non-trades resources to execute the 10 yearly tank inspections of the QCI Tanks.
Specific Works included;
-
- Internal & External Inspection
- Removal & Replacement of Safety Valves
- Testing of Safety Valves
- Mechanical Works
PGSR was engaged to provide all trades and non-trades resources to execute the major outage works on the Opal Unit 6 Boiler and Associated Plant.
Specific Works included;
-
- Internal & External Scaffolding
- Insulation Removal & Replacement
- Boiler Survey
- Non Destructive Testing
- Phased Array Ultrasonic Testing
- Pressure Welding – AS4041
- Removal & Replacement of Safety Valves
- Mechanical Fan Works
PGSR was engaged to provide all supervision, trades, non-trades and HSE resources to execute the minor outage works on the Mount Piper U2 project
PGSR were engaged to provide labour and tooling for the transformer maintenance at Bayswater power station
PGSR was engaged directly by Toshiba to provide labour and tooling / equipment resources to execute the Major Outage works on Unit 1 located at Eraring Lake Macquarie NSW.
PGSR was engaged directly by Freedom Ncube to provide labour and tooling / equipment resources to execute the Minor Outage works on their turbine located at Visy Pulp and Paper Tumut NSW.
PGSR were engaged to complete the Gas turbine repair at Mintaro Power Station. PGSR provided qualified trades and supervisory resources to carry out the initial inspection and disassembly of the turbine. Future projects will include the sourcing of spares, assembly and commission of this unit back into service.
PGSR was engaged to provide all supervision, trades, non-trades and HSE resources to execute the major outage works on the Mount Piper upgrade project
Specific works included:
Minor turbine inspection and maintenance
Generator inspection and maintenance
Overhaul of LP heater and installation
MSV and TCV inspection and works
PGSR was engaged directly by Toshiba to provide all trade, non-trade, tooling and equipment resources to execute the minor outage works on Bayswater Unit 1 Turbine
Specific works included:
Turbine disassembly, detailed inspection and reassembly
Pre works testing, VT Fuse installation
Inspection of TX Cooler fan, disassembly replacement and reassembly
Disassemble CV Actuator and replace Actuator with rotable spare, reassemble
PGSR was engaged directly by QAL to provide all trade, non-trade, tooling and equipment resources to execute the minor outage works on QAL Turbine and Generator overhaul work.
Specific works included:
- Turbine disassembly, detailed inspection and reassembly
- Emergency stop valve and control valve overhauls
- Generator disassembly, detailed inspection and reassembly
- Overhaul of Turbine and Generator auxiliary equipment including oil pumps, steam condenser and control devices